Smore logo
remove_red_eye 489
page background
Logo

Central Vermont Career Center

Re-Envisioning Updates

Central VermontCareer CenterRe-Envisioning Updates

Bond Warning Posted Bond Warning Posted

The Central Vermont Career Center School District (CVCCSD) Board approved the warning for a November 4 Bond vote at it's meeting on Monday, September 8, 2025. A community forum will be held on October 7, 2025 for discussion of this bond.

pdf
insert_drive_file
CVCCSDBondWarningSigned.pdf
Download
704.7 KB
pdf
insert_drive_file
CENTRAL VT CAREER CENTER BALLOT _ FINAL (PROOF).pdf
Download
127.3 KB

Forum October 7, 2024 6:00 PM Forum October 7, 2024 6:00 PM

User uploaded image
zoom_out_map Show in original size

Project Timeline - How long has this project been in the works? Project Timeline - How long has this project been in the works?

CVCC Bond Information Timeline

May 2018 Spaulding High School Board asks CVCC to relocate May-August 2018 CVCC Design/Build Team meets and determines that vision planning with an architect is necessary - reports out at September 2018 SHS/CVCC Board Meeting and a feasibility study is recommended. September 6, 2018 SHS Board...

launch docs.google.com

Frequently Asked Questons (FAQs) Frequently Asked Questons (FAQs)

User uploaded image
zoom_out_map

Top 10 Questions About the CVCCSD Facilities Project

1. Why not just renovate Spaulding High School?

Renovation proved unworkable: lab spaces require higher ceilings and larger footprints than exist at Spaulding; a parking garage would have been necessary; and the site is located in a flood zone and has yet to be tested for potential PCB concerns.

2. How many students will the new center serve?

The current enrollment stands at approximately 216 students. The new facility will serve 450–500 students, doubling access to programs.

3. What programs will be offered?

In addition to existing trades and health programs, CVCC plans to introduce Advanced Manufacturing, Cybersecurity/IT, Diesel Technology, Animal Science, Human Services, and more.

4. How much will the project cost?

The projected construction cost is $149 million, including contingencies.

5. Who pays for it?

The bond will be shared across the 18 towns in the CVCCSD and any school district sending students to the center. Tuition from sending schools will continue to be the main funding mechanism until the legislature changes CTE funding.

6. What will be the impact on my taxes?

A 30-year bond would require average annual repayment of about $9.4 million. Exact town-by-town impacts have been prepared, but projections are based on FY26 rates and enrollment.

7. How will this benefit the community?

Expanding access to high-quality Career and Technical Education (CTE) in our region is a cost-effective strategy for strengthening outcomes for our students, especially those from historically marginalized populations. By offering diverse career pathways, we can increase high school graduation rates and boost early-career earnings, which in turn strengthens central Vermont's job force in high-need areas. This expansion represents a sound public investment, as the lifetime public benefits—including increased tax revenue and reduced social costs—are likely to exceed the additional educational costs. Furthermore, by preparing students for direct entry into well-paying local jobs, we can help build our tax base and potentially lower the average age of our community, all while providing a vital hub for industry training for both students and adults.

8. How will traffic and neighborhood impacts be handled?

Traffic studies indicate that approximately 230 cars enter and 108 cars exit during the peak morning hours. Site design includes buffers, tree lines, and lighting controls to limit neighborhood disruption.

9. Why not wait for the state to change how facilities are funded?

State reform is uncertain and may not happen for years. Student demand is already greater than CVCC can serve, so waiting risks losing this opportunity.

10. Has demand for CTE programs really been studied?

Yes. Every two years, CVCC conducts a Comprehensive Local Needs Assessment (CLNA) using labor market data. Vermont faces a high demand for trades, healthcare, and technical fields that CTE programs directly address.

CVCCSD Facilities Project FAQs

Key Questions and Concerns from the Barre Town Selectboard Meeting on May 6, 2025: How many public hearings are scheduled for community input? What is the total projected cost of the facility? Who will be responsible for financing the project? What is the total square footage of the proposed ...

launch docs.google.com

Lawn Signs Available! Lawn Signs Available!

Reach out to hleland@cvtcc.org for yours today!

Lawn Signs Available at CVCC
zoom_out_map Show in original size

CVCC Website Resource CVCC Website Resource

Building the New CVCC

Central Vermont Career Center School District is located in Vermont. We offer over a dozen programs for students and adult learners to become valuable workers.

launch cvtcc.org

Publications Publications

pdf
insert_drive_file
Nov 4 CVCC Postcard.pdf
Download
5.3 MB
pdf
insert_drive_file
CVCCBrochure.pdf
Download
1.9 MB
pdf
insert_drive_file
CVCC Rack Card.pdf
Download
639.3 KB

Recent Media Recent Media

Montpelier Civic Forum: Jody Emerson, Central Vermont Career Center
Jody Emerson - Superintendent/Director of the Central Vermont Career Center
Recertification training for EMS workers in central Vermont to move to one school

Career Center Seeks $149 Million New Facility, Voters Decide on Nov. 4 - The Bridge

The Central Vermont Career Center School District (CVCC) is seeking a $149 million bond from taxpayers to build a new technical education center. The bond issue is up for a vote in member towns on Nov. 4. Citing both increased student interest in technical education and a growing need for people working in the trades, CVCC Director and Superintendent Jody Emerson notes that a new facility will allow expanded capacity and programming.  Should the bond vote pass, CVCC estimates average individual property tax increases within its member towns could range from $99 per year to $420 per year, and the

launch thebridgevt.org

CVCC Bond Information Timeline

May 2018 Spaulding High School Board asks CVCC to relocate May-August 2018 CVCC Design/Build Team meets and determines that vision planning with an architect is necessary - reports out at September 2018 SHS/CVCC Board Meeting and a feasibility study is recommended. September 6, 2018 SHS Board...

launch docs.google.com
Event Information
CVCCSD Bond Forum

CENTRAL VERMONT CAREER CENTER SCHOOL DISTRICT

CVCCSD Bond Forum & Board Meeting

Tuesday, October 7 · 6:00 – 8:00pm

CVCC, 155 Ayers Street, Suite 2, Room 134, Barre, VT 05641

Video call link: https://meet.google.com/our-jkhd-kmg

Or dial: ‪(US) +1 732-844-9553‬ PIN: ‪887 838 229‬#

More phone numbers: https://tel.meet/our-jkhd-kmg?pin=7297868352593



Board Agenda

When?
Tuesday, Oct 7, 2025, 06:00 PM
Where?
Central Vermont Career Center, 155 Ayers Street, Suite 2, Room 134, Barre, VT 05641
Jody Emerson
Jody is using Smore to create beautiful newsletters
Loading indicator

close

Created with

Communicate quickly and effectively with interactive newsletters.

Smore empowers educators to connect with their community, streamline school communications,
and increase engagement.

Create a newsletter