KHS Admin Relocation Project
March 2025

Project Updates - March 2025
Community Event
Celebrate with us before the 100 and 200 Buildings are removed. We are having a community event to memorize and take one last picture with the grand stair at Kennedy on March 15th at 2:00pm.
Construction Activity
- Over the break, the fire alarm main panel was relocated and installed in the new MDF room. Testing was completed to ensure the system was operational before staff and students returned from the break
- Also, during the break, a new intercom and bell system interface were installed, and the existing building is now connected to the upgraded system
- ADA walkway was completed with the installation of truncated domes in the student parking lot
Construction Work Planned for this Month
- Splicing, disconnecting, and reconnecting to fiber line in new MDF Room.
- Electrical and Architectural punch walk, and clean up site.