Miles ISD
Construction Update
June 12, 2026
High School Hallway Demo
High School Hallway Demo
High School Hallway Demo
Cafetorium
Cafetorium Stage Storage
Cafetorium Stage Storage
Windows from JH office hall looking east
JH
Hallway doors are flush with the wall to create more square footage in classrooms
Fire Suppression System Install
Ramp location ADA accessibility into the cafetorium from the JH
Hallway showing doors flush with wall
Teacher Workroom
Teacher Lounge
Mrs. Gonzales' Room
Mrs. Gonzales' Room
Mrs. Scroggs' Room.
Added Square footage.
JH Science Lab
Replacement of the Eyewash station is in progress.
Men Staff Bathroom
Storage
Summary of June 12, 2026
Progress is being made. All plumbing to the bathrooms has been completed. Walls studs are going up and electrical in the JH hallways is in progress. There is much to be done in the next few weeks, but great progress has been made. Stay tuned for updates.
June 2, 2026
JH
Attached are pictures from the renovation of the JH building. Currently, we are in the demolition phase of the project. The pictures below will show all that is currently being worked on.
West Side Bathrooms. Girls Bathroom- Larger and staff (women) bath will be added.
Room 3- Mrs. Boone. Extending the wall out to make classroom bigger
Hallway
Lockers were here as well as Mrs. Rainwaters office. These will eventually become a Teacher workroom, Conference room and Testing Room.
Science Lab
Boys Bathroom East side of the building
Coach Schneirs Room
Making classroom larger- making walls flush with other hallway walls.
Kitchen/Old Cafe
Kitchen
Kitchen office
Kitchen- Washer and Dryer area
Old Dishwashing area and Storage
Make one big room for dry storage
Kitchen West Exit
Main Kitchen
Floors will be completely redone with an non slip flooring.
Old Cafeteria
The old cafeteria will be turned into 4 smaller classrooms.
High School
HS Vestibule window will go here
Creating a secure vestibule where visitors must be buzzed in before having entry to hallways or the building. This picture is from when you walk directly into the hs building from door 1.
HS Office
Rearranging the HS office to create a secure vestibule. Visitors will no longer be able to enter the HS office unless buzzed in from the secure vestibule.
HS Office
Secretary's office is being shifted to the south where the window will be, in picture above.
Cafetorium
JH Entry to Cafetorium and eventual entry for JH parents and students
Cafetorium from stage looking to the office area
Stage storage area
Bathrooms for Cafetorium, located on the north side of the cafetorium
Cafetorium looking from the office to the stage
Construction overview
If you have questions please call me. 325.450-3934
Ty Stevens