Miles ISD

Construction Update

Miles ISDConstruction Update

June 12, 2026 June 12, 2026

User uploaded image
zoom_out_map

High School Hallway Demo

User uploaded image
zoom_out_map

High School Hallway Demo

User uploaded image
zoom_out_map

High School Hallway Demo

Cafetorium Cafetorium

User uploaded image
zoom_out_map

Cafetorium Stage Storage

User uploaded image
zoom_out_map

Cafetorium Stage Storage

User uploaded image
zoom_out_map

Windows from JH office hall looking east

JH JH

User uploaded image
zoom_out_map

Hallway doors are flush with the wall to create more square footage in classrooms

User uploaded image
zoom_out_map

Fire Suppression System Install

User uploaded image
zoom_out_map

Ramp location ADA accessibility into the cafetorium from the JH

User uploaded image
zoom_out_map

Hallway showing doors flush with wall

User uploaded image
zoom_out_map

Teacher Workroom

User uploaded image
zoom_out_map

Teacher Lounge

User uploaded image
zoom_out_map

Mrs. Gonzales' Room

User uploaded image
zoom_out_map

Mrs. Gonzales' Room

Added Square footage. The light line was where the wall was.
User uploaded image
zoom_out_map

Mrs. Scroggs' Room.

Added Square footage.

User uploaded image
zoom_out_map

JH Science Lab

Replacement of the Eyewash station is in progress.

User uploaded image
zoom_out_map

Men Staff Bathroom

User uploaded image
zoom_out_map

Storage

Summary of June 12, 2026

Progress is being made. All plumbing to the bathrooms has been completed. Walls studs are going up and electrical in the JH hallways is in progress. There is much to be done in the next few weeks, but great progress has been made. Stay tuned for updates.

June 2, 2026 June 2, 2026

Former Room 1 in JH. Mrs. McFarland's old room
zoom_out_map

JH

Attached are pictures from the renovation of the JH building. Currently, we are in the demolition phase of the project. The pictures below will show all that is currently being worked on.

User uploaded image
zoom_out_map

West Side Bathrooms. Girls Bathroom- Larger and staff (women) bath will be added.

User uploaded image
zoom_out_map

Room 3- Mrs. Boone. Extending the wall out to make classroom bigger

User uploaded image
zoom_out_map

Hallway

Lockers were here as well as Mrs. Rainwaters office. These will eventually become a Teacher workroom, Conference room and Testing Room.

User uploaded image
zoom_out_map

Science Lab

User uploaded image
zoom_out_map

Boys Bathroom East side of the building

User uploaded image
zoom_out_map

Coach Schneirs Room

Making classroom larger- making walls flush with other hallway walls.

Kitchen/Old Cafe

Kitchen

User uploaded image
zoom_out_map

Kitchen office

User uploaded image
zoom_out_map

Kitchen- Washer and Dryer area

User uploaded image
zoom_out_map

Old Dishwashing area and Storage

Make one big room for dry storage

User uploaded image
zoom_out_map

Kitchen West Exit

User uploaded image
zoom_out_map

Main Kitchen

Floors will be completely redone with an non slip flooring.

User uploaded image
zoom_out_map

Old Cafeteria

The old cafeteria will be turned into 4 smaller classrooms.

High School High School

Hallway Entrance to the building.  Removing all old tile flooring.  Will be replaced by vinyl plank flooring.
zoom_out_map Show in original size
User uploaded image
zoom_out_map

HS Vestibule window will go here

Creating a secure vestibule where visitors must be buzzed in before having entry to hallways or the building. This picture is from when you walk directly into the hs building from door 1.

User uploaded image
zoom_out_map

HS Office

Rearranging the HS office to create a secure vestibule. Visitors will no longer be able to enter the HS office unless buzzed in from the secure vestibule.

User uploaded image
zoom_out_map

HS Office

Secretary's office is being shifted to the south where the window will be, in picture above.

Cafetorium Cafetorium

User uploaded image
zoom_out_map

JH Entry to Cafetorium and eventual entry for JH parents and students

User uploaded image
zoom_out_map

Cafetorium from stage looking to the office area

User uploaded image
zoom_out_map

Stage storage area

User uploaded image
zoom_out_map

Bathrooms for Cafetorium, located on the north side of the cafetorium

User uploaded image
zoom_out_map

Cafetorium looking from the office to the stage

Construction overview

The pictures above show the progress of what you cannot see from the outside. This is an exciting time for our school district. There have been some delays and construction issues that we have had to work through, however, I believe you will be very satisfied with the turnout of these buildings. Periodically I will update everyone on the progress we are making. There are many great things happening in our district and it is an exciting time to be a Miles Bulldog.


If you have questions please call me. 325.450-3934


Ty Stevens

Ty Stevens
Ty is using Smore to create beautiful newsletters
Loading indicator

close

Created with

Communicate quickly and effectively with interactive newsletters.

Smore empowers educators to connect with their community, streamline school communications,
and increase engagement.

Create a newsletter